Skip to main content
The Harvest integration imports clients, contacts, projects, tasks, users, time entries, expenses and invoice history from Harvest into Pike, with optional ongoing sync while your team switches over. Harvest Forecast schedules import as Pike allocations.

Connect Harvest

  1. Go to Workspace settings → Integrations → Harvest.
  2. Click Add integration.
  3. Authorize Pike in the Harvest popup. Sign in as a Harvest administrator so Pike can read rates, cost rates and every project.
Only workspace admins can connect or disconnect Harvest.

Import data

On the integration page, click Import data. The stepper runs entities in dependency order, so clients import before the projects and time entries that reference them. It skips entities whose Read toggle is off, names them, and links to sync settings.

What syncs

Full history

The import has no date cutoff. Pike reads every client, project, and time entry the Harvest API returns, archived ones included, so ten years of history imports the same way as last month. Imported data behaves like data created in Pike: archived projects keep their budgets, actuals, and margin, and every dashboard and metric accepts any period back to your first Harvest entry. The archive export you take in week one is a backup copy, not a limit on what imports.

How budgets, actuals, write-offs, invoices, and structure map

Pike imports records with their links intact. A time entry keeps its project, task, person, rate, cost rate, and invoice, so historical margin in Pike matches the margin Harvest reported.

What does not migrate

Some things in Harvest are settings or files, not records. Pike does not import them, and each has a direct replacement you set up during onboarding.
  • Saved reports and report filters: rebuild them as Pike dashboards, usually in the first week.
  • Open estimates: recreate them as deals, with value and expected close date.
  • Recurring invoice schedules, invoice themes, and payment settings: set them once in Pike invoice settings.
  • Harvest integrations, such as the QuickBooks or Xero link: reconnect them directly to Pike.
  • Passwords and sign-in settings: people sign in to Pike with their own account or SSO.

Projects, rates and budgets

Time entries

Time entries Harvest marks as billed import as invoiced, with the Harvest invoice number.

Forecast schedule

Harvest Forecast has no public API, so Pike reads its schedule export. With Import Forecast on, upload the Projects schedule export from Forecast. Pike matches each row to a member by name and to a project by client and project name, and creates allocations with the hours per week.

Keep syncing during a transition

Keep syncing is off by default. When it is on, Pike imports new Harvest records and time entries every 3 hours, or in real time on the Enterprise plan, so teams can switch over gradually. See How sync works.

Sync settings

While Harvest is connected, the What syncs with Harvest card appears under the top button row on the integration page. Each entity has a Read toggle (Harvest to Pike). Toggles save immediately. New connections start with Read on for everything.

Synced records

Every synced record shows the Harvest marker, Last synced with a time, and a Refresh action. Refresh shows only while Read is on for that entity.

Sync issues

Records that fail to sync appear in the Sync issues list on the integration page, with the record, the reason, and a Retry action. The integration never deletes Pike data. A record removed in Harvest is marked Removed in Harvest in Pike and kept.

Disconnect

Disconnecting Harvest stops syncing and keeps all imported data. Linked records keep their history.

Permissions

Synced data follows Pike roles and private projects. See Permissions and access.

Limits

  • Invoices from Harvest import as read-only history. New invoices go out from Pike.
  • Pike does not write to Harvest.
  • Harvest estimates and retainers do not import. Create open estimates as deals and retainers as retainer projects in Pike.