Skip to main content
The Harvest integration imports clients, projects, tasks, users, and time entries from Harvest into Pike, with optional nightly sync while your team switches over. Harvest Forecast assignments can come across as Pike allocations.

Connect Harvest

  1. Go to Workspace settings → Integrations → Harvest.
  2. Click Add integration.
  3. Authorize Pike in the Harvest popup.
Only workspace admins can connect or disconnect Harvest.

Import data

On the integration page, click Import data. The stepper runs entities in dependency order, so clients import before the projects and time entries that reference them. It skips entities whose Read toggle is off, names them, and links to sync settings.

What syncs

Daily sync during a transition

Daily sync is off by default. When on, Pike imports new Harvest time entries every night, so teams can switch over gradually.

Sync settings

While Harvest is connected, the What syncs with Harvest card sits under the top button row on the integration page. Each entity has a Read toggle (Harvest to Pike). Toggles save immediately. New connections start with Read on for everything.

Synced records

Every synced record shows the Harvest marker, “Last synced ” or “Not synced yet”, and a Refresh action. Refresh shows only while Read is on for that entity.

Sync issues

Records that fail to sync appear in the Sync issues list on the integration page, with the record, the reason, and a Retry action. The integration never deletes Pike data on its own. A record removed in Harvest is marked “Removed in Harvest” in Pike, never deleted.

Disconnect

Disconnecting Harvest stops syncing and keeps all imported data. Linked records keep their history.

Permissions

Synced data respects Pike roles and private projects. A private project’s tasks never sync out to anyone who cannot see the project in Pike.

Limits

  • Invoices from Harvest import as read-only history.
  • Pike does not write to Harvest.