The Linear integration syncs Linear issues into Pike tasks in real time. Estimate points become allocated hours, and cycles can become phases, so delivery leads plan capacity and track margin on the work engineers run in Linear.

Connect Linear

  1. Go to Workspace settings → Integrations → Linear.
  2. Click Add integration.
  3. Authorize Pike in the Linear popup.
  4. On the integration page, map each Linear team or project to a Pike project.
Only workspace admins can connect or disconnect Linear.

Import data

On the integration page, click Import data. The stepper runs entities in dependency order, so cycles import as phases before the issues that sit in them. It skips entities whose Read toggle is off, names them, and links to sync settings.

What syncs

Linear issues become Pike tasks.

Source of truth

Once a record is linked, Linear owns the linked fields and Pike reads them back. Pike-only fields, such as project links, internal notes, allocations, and cost profiles, stay in Pike and are never overwritten.

Schedule

Changes in Linear reach Pike in real time through Linear webhooks. Import data and Refresh always run on demand.

Sync settings

While Linear is connected, the What syncs with Linear card sits under the top button row on the integration page. Each entity has a Read toggle (Linear to Pike). Toggles save immediately. New connections start with Read on for everything.

Synced records

Every synced record shows the Linear marker, “Last synced ” or “Not synced yet”, and a Refresh action. Refresh shows only while Read is on for that entity. Each synced task also shows the Linear identifier and an Open in Linear link.

Sync issues

Records that fail to sync appear in the Sync issues list on the integration page, with the record, the reason, and a Retry action. The integration never deletes Pike data on its own. A record removed in Linear is marked “Removed in Linear” in Pike, never deleted.

Disconnect

Disconnecting Linear stops syncing and keeps all imported data. Linked records keep their history.

Permissions

Synced data respects Pike roles and private projects. A private project’s tasks never sync out to anyone who cannot see the project in Pike.

Limits

  • Pike does not write back to Linear.
  • Linear has no time log, so time logged in Pike stays in Pike.