Resources
Project team, timeline, and links to all resource allocation docs.
Allocate by share of capacity
Book a member as a percentage of contracted time, for example 50% of capacity for two weeks.- Open the allocation dialog from a task Allocations row, Members → Allocations, or a project Resources timeline block.
- Pick the member and set the allocation period.
- Select the % toggle above the amount field.
- Enter the share of capacity. Pike converts it to hours using the member’s employment contract for those dates.
- Check the summary line at the bottom (hours per day, per week, share of capacity), then save.
Allocation properties
The three entry modes and how they convert.
Placeholder positions: assign, allocate, convert
Use a position when you know the role (for example “Senior consultant”) but not the person yet.- Define the position. Go to Members → Settings → Member positions and create the role with its default hourly rate.
- Assign it on the task. Open Assigned to on the task page or sidebar and pick the position from the same picker as members. You can also add positions to the project team on the Resources tab.
- Allocate hours. Expand Allocations on the task (or open the position row on Members → Allocations → Timeline), click + on the position row, and enter dates and hours. Use h or per-weekday entry.
- Convert to a member. When the role is filled, click Assign on the position row in Allocations (or use the assignment picker) and choose the member.
- With no allocations yet, Pike replaces the position assignee immediately.
- With existing allocation blocks, Pike asks you to confirm, then moves the planned hours to the member.
Members
Member positions and skills under Members → Settings.
Allocate from a task
Open a task from a board, list, timeline, or sidebar and expand Allocations below the description. Allocations are available only when the task belongs to a project. The section lists each assignee (member or position) with allocation blocks, total hours, and date ranges. Click + on a row to add a block, or Allocate assignee to pick someone new. Pike adds them to the task if needed.Edit tasks
Task page, sidebar, and assignment pickers.
Allocate from project resources
Open the project Resources tab, add members and positions, then create allocations on the timeline heatmap. Load reflects each person’s allocations across the whole workspace, not only this project. Expand a member row to see assigned tasks, and drag allocation bars to change dates. Position rows work the same way.Resources
Adding members, rates, and the project timeline.
Allocate from the workspace view
Go to Members → Allocations for workspace-wide planning. It has two views, and the same filters apply to both. Pike remembers your last view.Workspace capacity
How available and allocated hours are calculated.