Overview
Overview lists every member with their Name, E-mail, Teams and Joined date. The view menu at the top left switches between List and Org chart. Click a member to open their profile. A row’s menu has Edit, Suspend and Restore, and Convert to regular user for virtual users.Invite members
Click Invite to open Invite your team members.
- Enter an email address, and pick the team and role for that person.
- Click Add for another row, or Import to add several people at once.
- Click Send.
Allocations
The Allocations tab shows each member’s workload over a selected period: allocations across projects and tasks, plus the tasks assigned to them. Heatmap cells stack confirmed (solid) and tentative (dots) hours, and hovering a cell shows the split. Past periods show the hours logged under the booked amount. Use it to catch overload before deadlines slip.Resources
Project team, timeline, and all resource allocation docs.
Workspace capacity
Heatmap, timeline, filters, and capacity calculations.
Teams
The Teams tab lists the workspace teams. See Workspace teams.Contractors
Contractors lists the freelancers and agencies you work with, with their email, skills and hourly cost. Click Create contractor to add one with contact details, notes, skills, hourly cost and status (Active, Inactive or Hired). A contractor can be the supplier on a deal line item.
Archive a contractor
A contractor used on a deal or project is archived instead of deleted, so those records still show it. In the row menu, Delete becomes Archive, with a line such as On 2 deals and 1 project that shows where the contractor is used. Archiving happens straight away and the confirmation offers Undo. A contractor nothing uses is deleted after you confirm. Archived contractors leave the list and the pickers. Deals and projects that used them keep their name, shown with (archived). Turn on Show archived to see them, and click Restore on a row to bring one back. When you remove several contractors at once, Pike archives the ones in use and deletes the rest.Positions and skills
Admins, managers and HR set positions and skills in workspace settings.- Workspace settings Positions: each position has a Title, an Hourly rate (what you bill) and an Hourly cost (what an hour costs you). A member has one position. Rates fill in when you add people to projects, and the cost is used for open positions and for members without a contract. Positions use the same archive rules as contractors: Delete becomes Archive when a deal or project uses the position, Show archived lists archived ones, and Restore brings one back. Archived positions keep their name on old records and drop out of the pickers.
- Workspace settings Skills: named skills you give each member with a level, from Beginner to Expert.

Placeholder positions on tasks
- Create the position in Workspace settings Positions.
- On a task, add the position under Assigned to (same picker as members).
- In Allocations, click + on the position row and plan hours (total or per weekday).
- When you hire someone, click Assign on that row and pick the member. Pike moves existing allocation blocks after you confirm.